March 20. Tibet through Nepal Army Arughat Benighat-border road connecting larkebhanyana open a new track is started. The army camp in the village of Thumi Armala the construction of roads. The army has been deployed in teams of five under construction.
Army engineer Nishant Pandit havadamdadekhi lapu bhirasamma the crushed rock to make a hole for the bomb blast has been done. Army for the construction of 16 km roads havadamdadekhi uhiyako tatopanisamma stated that it has even studied. About a hundred 83 km road in Dhading benighatadekhi larkebhanyanasammako durimadhye military Arughat-larkebhanyana about a hundred 21 km section of the road working on a new track opening. 62 km road section of the Department of Benighat-havadamda was built.
To open a new track being lapubhira havadamdadekhi rupaimyam two million 50 million has been allocated. Machakholama next few days camping in the open section of the new track started Pandit said the engineer. Manaslu trekking trail in places due to the construction of the road option is another way to open the preparation undergoing.
No comments:
Post a Comment